03

JAN

Sh. Rajib Sutradhar, Employee No. 60004 is re- designated as Chief General Manager with effect from 01.01.2020.

03

JAN

Sh. Amaresh Mallick, Employee No. 60005 is redesignated as Chief General Manager with effect from 01.01.2020.

03

JAN

Sh. V. Kaikhochin, Employee no. 60003 is designated as Chief General Manager with effect from 01.01.2020

03

JAN

Total MU dispatched under this scheme as Up quantum is 0.37 MU and as down quantum is 9.95 MU. Maximum RRAS up quantum was 0.05 MU on 01.12.2019 and Maximum RRAS down quantum was 0.62 MU on 04.12.2019.

03

JAN

Maximum frequency was 50.34 Hz on 15.12.19, Minimum frequency was 49.65 Hz on 11.12.19 and Average Frequency was 50.00 Hz.

03

JAN

Maximum Demand Met of NER (excluding Bangladesh) was 2530 MW at 17:29 Hrs on 23.12.19 and 42.15 MU on 31.12.2019. Total energy consumed in NER (excluding Bangladesh) was 1228.99  MU.

The main responsibilities of NERLDC are monitoring of system parameters and system security. To ensure the integrated operation of the power system in the Northern Eastern Region. System studies,planning and contingency analysis.

2020-01-28 23:20

Last Updated On

50.03 Hz

NER Grid Frequency

1585 MW

NER Demand Met

191

current sch Rev No

130581 MW

All India Demand Met

179.9 Unit

DSM Rate

Vision / Mission

Vision: To be a global institution of excellence for reliable & resilient power systems, fostering efficient electricity markets, promoting economy and sustainability. Mission: * Ensure Integrated Operation of the Indian Power System to facilitate transfer of electric power within and across the regions and trans-national exchange of power with Reliability, Economy and Sustainability. * Facilitate competitive and efficient wholesale electricity markets and administer settlement systems. * Promote innovation and adoption of latest technology with cyber security. * Nurturing human & intellectual capital.

Disclaimer

Disclaimer


Precautions have been taken by North Eastern Regional Load Despatch Centre (NERLDC), POSOCO to upload the data/information and the uploaded data/information is believed to be accurate, reliable and complete. However, before relying on the information material, users are advised to ensure its accuracy, currency, completeness and relevance for their purposes, and, in this respect, North Eastern Regional Load Despatch Centre (NERLDC), POSOCO shall not be responsible for any errors or omissions. All information is provided without warranty of any kind. North Eastern Regional Load Despatch Centre (NERLDC) disclaims all express, implied, and statutory warranties of any kind to user and/or any third party, including warranties as to accuracy, timeliness, completeness, merchantability, or fitness for any particular purpose. North Eastern Regional Load Despatch Centre (NERLDC), POSOCO have no liability in tort, contract, or otherwise to user and/or third party. Further, North Eastern Regional Load Despatch Centre (NERLDC), POSOCO shall, under no circumstances, be liable to user, and/or any third party, for any lost profits or lost opportunity, indirect, special, consequential, incidental, or punitive damages whatsoever, even if North Eastern Regional Load Despatch Centre (NERLDC), POSOCO has been advised of the possibility of such damages. By visiting this site, the users confirm about their awareness and agreement to this disclaimer and associated terms referred elsewhere.